HSG258 is the Health and Safety Executive (HSE) guide to local exhaust ventilation (LEV). Its full title is Controlling airborne contaminants at work. The third edition was published in 2017 and HSE offers it as a free PDF. It is guidance, not law. This guide shows which chapters and paragraphs to read for each job, from buying LEV to reading a test report.

First published 19 October 2026. Checked 8 November 2026.

Three flexible extraction hoses join overhead metal ducts leading to a raised fan and filter unit.
published in 2017
3rd edition
chapters, plus two appendices
10
numbered paragraphs in the chapters
364
PDF download from HSE
Free

What HSG258 is

HSG258 is HSE's series code for the book. You will also see it written HSG 258. The first edition came out in 2008, the second in 2011 and the third in 2017 (page 2 of the PDF). HSE says the third edition "contains minor amendments and clarifications, but the advice is broadly unchanged". Neither the PDF nor HSE's page lists the changes item by item.

HSE wrote it for employers who use or intend to use LEV. It also helps suppliers of LEV, managers, and trade union and employee safety representatives (paragraph 3). The cover says it "describes the principles of deciding on, designing, commissioning and testing effective LEV". Paragraph 3 adds that different chapters suit different readers.

The aim, in paragraph 2, is to help employers control exposure to gas, vapour, dust, fume and mist "by extracting the clouds of contaminant before people breathe them in".

Where to get HSG258

HSE publishes the third edition as a free PDF. The PDF calls itself a "free-to-download, web-friendly version" that has been "adapted for online use from HSE's current printed version". Its cover says the printed book can be bought at books.hse.gov.uk.

Where HSE publishes HSG258
WhatWhere
The free PDF of the third editionHSE: HSG258 PDF
HSE's publication page, with the download linkHSE: HSG258 publication page

Is HSG258 the law?

No. HSG258 says so on page 2: "Following the guidance is not compulsory, unless specifically stated, and you are free to take other action." It adds that following it will normally be enough to comply with the law.

The legal duties sit in the law itself. For employers, paragraph 24 names three laws. They are the Health and Safety at Work etc Act 1974, the Control of Substances Hazardous to Health Regulations 2002 (COSHH) and the Management of Health and Safety at Work Regulations 1999. Appendix 1 summarises the duties for employers, suppliers and service providers.

Chapter 10 says it "supplements guidance in the COSHH ACOP and guidance" (paragraph 323). L5, the COSHH Approved Code of Practice, points employers to HSG258 for LEV examination and testing (L5 paragraph 185). The guide to LEV testing regulations sets out the chain of law and the legal status of L5.

Which chapter to read for which job

HSG258 has ten chapters with 364 numbered paragraphs, plus two appendices that number their own paragraphs from 1. Use the paragraph numbers below to go straight to what you need.

HSG258 chapters, paragraph numbers and the job each one does
Chapter and paragraphsRead it when you are
Chapter 1, paragraphs 1 to 9Checking what the book covers. Paragraph 9 lists what it leaves out.
Chapter 2, paragraphs 10 to 32Working out who does what. It names the parts of an LEV system (paragraph 10), the roles (paragraphs 13 to 23), legal responsibilities (paragraph 24) and competence (paragraphs 26 to 30). Paragraph 14 lists the other control options to consider before LEV.
Chapter 3, paragraphs 33 to 52Learning how dust, fume, mist, vapour and gas behave in air. Paragraphs 42 and 51 explain why hoods at floor level do not control "heavy dust" or "heavy vapours".
Chapter 4, paragraphs 53 to 60Identifying the process and the source of the contaminant. Paragraph 55 sorts sources into four types.
Chapter 5, paragraphs 61 to 86Buying or specifying LEV. Paragraph 74 lists what the employer should describe and require from the supplier, including indicators, training, a user manual and a logbook.
Chapter 6, paragraphs 87 to 159Understanding hoods. Paragraphs 95 to 99 sort them into enclosing, receiving and capturing hoods.
Chapter 7, paragraphs 160 to 256Looking at everything behind the hood: ducting, fans, air cleaners, discharge, airflow indicators (paragraphs 229 to 231) and make-up air (paragraphs 237 to 240). Paragraph 241 lists when "LEV might not be the right control solution".
Chapter 8, paragraphs 257 to 303Installing and commissioning LEV, or commissioning a system nobody documented. The four stages are in paragraph 262 and the contents of the report in paragraph 303.
Chapter 9, paragraphs 304 to 322Checking you have the right documents: the user manual (paragraphs 307 to 317) and the logbook (paragraphs 318 to 320). Paragraphs 321 and 322 cover systems with neither.
Chapter 10, paragraphs 323 to 364Preparing for a thorough examination and test, or reading its result. Preparation is paragraphs 332 to 335, the three stages 336 to 343, labels 345 to 347, the report 348 to 351 and measurement methods 352 to 364.
Appendix 1, paragraphs 1 to 17Seeing the legal duties HSE summarises for employers, the self-employed, suppliers and service providers, and the routes to competence.
Appendix 2Setting an exposure benchmark for the specification, including for a substance that has no exposure limit (paragraph 80 points to it).

The roles HSG258 gives people

Chapter 2 sets out who is who (paragraphs 12 to 23 and Figure 2). Figure 2 notes that roles can overlap. A supplier may go on to act as a service provider. The installer may be the design company, a service provider or even the employer if competent (paragraphs 18 and 19).

The people HSG258 chapter 2 names around one LEV system: 1 employer, 2 employees, 3 supplier and designer, 4 installer, 5 commissioner, 6 maintenance and repair engineer, 7 examiner. Choose a person to see what the guide says about that role.
Roles in HSG258 chapter 2
RoleWhat HSG258 says
EmployerThe "system owner" and the client for a new or redesigned LEV system (paragraph 13). The key points at the start of Chapter 2 say the employer, the LEV owner, must ensure controls are adequate.
EmployeesOperators "should make full and proper use of any LEV provided and report any faults" (paragraph 13). Routine checks are usually done by employees or supervisors (paragraph 17).
Supplier and designerSuppliers provide an LEV system and may then act as a service provider. Designers "interpret the requirements of the employer and advise on an effective LEV system" (paragraph 18).
InstallerWorks with the commissioner so that the equipment supplied gives adequate control of the contaminant (paragraph 19).
CommissionerChecks that the system delivers its design performance and writes the commissioning report that later checks compare against (paragraph 21).
Maintenance and repair engineerUsually a service provider, sometimes an employee (paragraph 22).
ExaminerCarries out the thorough examination and test. Usually a service provider, but it can be "a competent person who could be an employee" (paragraph 23).

Terms HSG258 uses

Competence runs through every role. Paragraph 26 defines it as "people having sufficient training, knowledge and experience to carry out the job they are employed to do". Paragraph 31 names training from the Institution of Local Exhaust Ventilation Engineers (ILEVE) and the British Occupational Hygiene Society (BOHS), but ILEVE has been dormant since April 2024. The guide to LEV tester qualifications covers what to ask a tester.

The table gives four terms HSG258 defines, with the paragraph for each.

Key terms in HSG258
TermWhat HSG258 says
Commissioning"Proving that an LEV system is capable of providing adequate control" (paragraph 258). It has four stages: installation, technical performance, control effectiveness and reports (paragraph 262).
Commissioning reportProduced by the commissioner. Paragraph 299 says it "provides a reference against which to compare regular checks and maintenance and statutory thorough examination and testing". Paragraph 303 lists its contents.
Control effectivenessStage 3 of commissioning, "demonstrating adequate control of contaminant clouds" (paragraph 262). Paragraph 280 sorts systems into three groups. They are a design known to be effective, a design proven qualitatively to be effective, and a design that appears adequate but where effectiveness is uncertain.
Thorough examination and test"A detailed and systematic examination sufficient to make sure that the LEV can continue to perform as intended by design and will contribute to the adequate control of exposure" (paragraph 327).

The documents HSG258 expects you to have

Chapter 9 tells employers to ask LEV suppliers for a user manual and a logbook. Paragraph 74 says the employer should require both in the specification.

Many LEV systems were never commissioned or supplied with a user manual (paragraph 263). Paragraph 321 tells the employer to approach the manufacturer first, then an LEV specialist.

Tick each document you have.

The thorough examination and test in HSG258

Chapter 10 covers the statutory examination and test by a competent person. Paragraph 329 says the maximum time between tests is set in COSHH and "for most systems this is 14 months", with the exceptions in Table 18.

Paragraph 336 splits the work into three stages: a visual and structural examination, a review of technical performance and an assessment of control effectiveness. Labels are in paragraphs 345 to 347, and paragraph 349 lists what the record contains.

HSG258, L5, INDG408 and INDG409

HSE publishes three other documents on LEV. Each is written for a different reader.

Four HSE documents on LEV, drawn as covers. Choose one to see who it is written for and what it gives you.
HSG258 and three other HSE documents on LEV
DocumentWritten forWhat it gives you
HSG258, Controlling airborne contaminants at workEmployers who use or intend to use LEV, and suppliers, managers and safety representativesThe detail on specifying, designing, commissioning, documenting and testing LEV
L5, the COSHH Approved Code of Practice and guidanceDutyholders and health and safety professionalsThe Code and guidance on COSHH. Paragraph 185 points to HSG258 for LEV examination and testing
INDG408, Clearing the airEmployers, and people who buy or install LEVA short HSE leaflet on selecting, using and maintaining LEV
INDG409, Time to clear the air!Employees in jobs that produce airborne dust, mist, fumes or gasA pocket card with a daily checklist

What HSG258 does not cover

Paragraph 9 leaves out specialised topics such as biological agents, radioactive substances, pharmaceutical containment, confined spaces, air blowers, refuges (clean rooms in contaminated environments) and cleaning systems. It also leaves out flammability issues such as zoning or explosion relief (paragraph 47), and the testing of air discharges that environmental law may require (paragraph 340).

Where to go next

This guide is a map of HSG258. Each of these takes one question further.

More LevHQ guides on HSG258 topics
QuestionWhere to look
The chain of law, and the legal status of L5LEV testing regulations
The 14-month limit and the Schedule 4 processesHow often is LEV testing required?
What the examiner does in each of the three stagesWhat happens during an LEV test?
What the written report should tell youYour LEV test report and certificate explained
The parts of an LEV system and how hoods workWhat is local exhaust ventilation?
What examiner qualifications meanLEV tester qualifications
Working out your next dateLEV test due date calculator
Finding companies that design and install LEVLEV design and installation companies
Finding a tester in your areaLEV testing companies in the UK

Check what you know

4 quick questions from this guide. Nothing you choose is saved or sent.

  1. Is following HSG258 compulsory?
    Show the answer

    No, but following it will normally be enough to comply with the law. HSG258 says on page 2 that following the guidance is not compulsory unless specifically stated. It adds that following it will normally be enough to comply with the law.

  2. Which part of HSG258 covers preparing for a thorough examination and test, or reading its result?
    Show the answer

    Chapter 10. HSG258 chapter 10, paragraphs 323 to 364, covers the statutory examination and test, from preparation and the three stages to labels and the report. Chapter 2 sets out who is who.

  3. Who writes the commissioning report that later checks compare against?
    Show the answer

    The commissioner. HSG258 paragraph 277 says the commissioning report is the outcome of the commissioner's observation, testing and measurement, and sets the benchmarks that statutory test results are compared with.

  4. Which HSE document is a pocket card with a daily checklist?
    Show the answer

    INDG409. HSE publishes INDG409, Time to clear the air!, as a pocket card for employees. INDG408, Clearing the air, is a short leaflet for employers and people who buy or install LEV.

Questions duty holders ask

What is HSG258?

HSG258 is the Health and Safety Executive's guide to local exhaust ventilation, titled Controlling airborne contaminants at work. The third edition dates from 2017. It is written for employers who use or plan to use LEV and covers deciding on, designing, commissioning and testing it. HSE publishes it as a free PDF.

Is HSG258 a legal requirement?

No. HSG258 says following the guidance is not compulsory unless specifically stated, and you are free to take other action. If you do follow it you will normally be doing enough to comply with the law. The legal duties come from the Health and Safety at Work etc Act 1974 and COSHH.

Where can I download HSG258?

HSE publishes a free PDF of the third edition. Use the download link on HSE's HSG258 publication page, or open the PDF at hse.gov.uk/pubns/priced/hsg258.pdf. The PDF describes itself as a web-friendly version adapted from the printed book, and its cover says the book can be bought from HSE Books.

What changed in the third edition of HSG258?

HSE says the third edition has minor amendments and clarifications and that the advice is broadly unchanged. It includes the updates made in the second edition based on feedback from industry. The earlier editions were published in 2008 and 2011. Neither the PDF nor HSE's page lists the changes item by item.

Who is HSG258 for?

Employers who use or intend to use LEV. HSE says it also helps suppliers of LEV, managers, and trade union and employee safety representatives. Chapter 2 sets out the roles of employer, supplier, designer, installer, commissioner, maintenance engineer and examiner, and paragraph 3 says different chapters suit different readers.

Is your next test due?

Put in the date of the last test and get the deadline, with a reminder if you want one.

LEV test due date calculator

Use the directory to find an LEV tester near you.

Find LEV testing companies

Browse LEV testing companies across the UK, or choose a region.

Sources

Read next