LEV testing directory and reports for the UK

Integral HSE

Mansfield, NG19 7AE

  • P601 qualified (claimed by the company)
  • BOHS (claimed by the company)
  • IOSH (claimed by the company)
  • Faculty of Occupational Hygiene (claimed by the company)
  • Covers 80 km

From the company's website (excerpt)

Integral HSE's highly qualified and experienced LEV engineers can guide you every step of the journey from the initial identification of a need for LEV to the detailed management of systems already in place. Performance specification for new systems. Detailed LEV design service. Commissioning. Initial appraisal. Thorough examination and test. Routine maintenance checks. Pre use checks. Development of an LEV management system.

Company registration

Registered at Companies House since 2011. The Companies House record gives its status as Active.

What the listed services involve

LEV testing

A thorough examination and test checks the condition of your extraction system and measures airflow to assess how it controls exposure. For most LEV, this is required at least every 14 months under regulation 9 of the Control of Substances Hazardous to Health Regulations 2002.

LEV design

Design starts with the work process and the dust, fumes or vapours it produces. It involves choosing capture hoods and sizing the extraction equipment around how your staff actually use the workspace.

LEV installation

Installation involves fitting the extraction equipment and connecting it to the machines or work areas it serves. Commissioning checks its performance under working conditions and establishes measurements for comparison at later tests.

Fume extraction

Fume extraction draws airborne contaminants away from a process before they spread through the workplace. Selecting suitable capture equipment and air treatment depends on the fumes or vapours produced and how the work is done.

Welding fume

Welding fume extraction uses equipment such as movable capture arms, extracted benches or on-torch extraction to collect fume near the weld. Positioning the capture point and allowing for the welder's movements are part of making it effective.

Workplace air monitoring

Air monitoring measures airborne substances, often by taking samples in a worker's breathing zone during normal tasks. Results help assess exposure and whether the controls in place are doing enough.

Face fit testing

A face fit test checks whether a particular make, model and size of tight-fitting respirator forms a seal on the wearer's face. It helps you select suitable respiratory protection for that individual.

Training

Training can help operators recognise poor extraction, position capture hoods and carry out routine checks. The content should match the equipment they use and the actions they need to take when something is wrong.

Company number: 07688811 - Companies House record

Services

  • LEV testing
  • LEV design
  • LEV installation
  • Fume extraction
  • Welding fume
  • Workplace air monitoring
  • Face fit testing
  • Training

LEV testing in Mansfield

Is this your company? Enter the company email. We will send the claim link only to the address held on this listing.