The testing interval
The duty comes from the Control of Substances Hazardous to Health Regulations 2002 (COSHH). Regulation 9 requires local exhaust ventilation (LEV) used as a control measure to be thoroughly examined and tested at least once every 14 months, or at the shorter interval in Schedule 4 for the processes listed there. Employers should book before the applicable deadline to allow time for access problems, production changes or a tester needing to return.
The requirement concerns the extraction systems used to control exposure to hazardous substances at work. It is separate from routine maintenance. Check the process served by each installation, rather than assuming all LEV systems at the site follow the same calendar.
When the interval is shorter than 14 months
Schedule 4 is titled "FREQUENCY OF THOROUGH EXAMINATION AND TEST OF LOCAL EXHAUST VENTILATION PLANT USED IN CERTAIN PROCESSES". Its process descriptions and minimum frequencies are reproduced below. Regulation 9(2)(a) requires examination and testing at not more than the corresponding interval.
HSG258 also recommends more frequent examinations where wear could reduce effectiveness between visits. The process, the condition of the extraction and the available performance records matter when deciding on an earlier date.
- Processes in which blasting is carried out in or incidental to the cleaning of metal castings, in connection with their manufacture. Minimum frequency: 1 month.
- Processes, other than wet processes, in which metal articles (other than of gold, platinum or iridium) are ground, abraded or polished using mechanical power, in any room for more than 12 hours in any week. Minimum frequency: 6 months.
- Processes giving off dust or fume in which non-ferrous metal castings are produced. Minimum frequency: 6 months.
- Jute cloth manufacture. Minimum frequency: 1 month.
Count from the last test date
For a system on the general interval, count 14 calendar months from the date of the last thorough examination and test. For example, a test completed on 12 February 2026 reaches its 14-month deadline on 12 April 2027. The next test must be completed by that date. Allow enough time for the visit to take place.
The report and test label, if one was fitted, should show the last test date. Use the LevHQ LEV test due date calculator to check the deadline and set a reminder. If your risk assessment, manufacturer or previous report sets an earlier interval, use that earlier date instead of the general 14-month maximum.
Keep the records together
The employer must keep a suitable record of examinations, tests and repairs resulting from them. The record, or a suitable summary, must remain available for at least five years from the date it was made. Keep the full report rather than relying on a label. The report should identify the system, record its condition and measurements, compare performance with the intended standard and list any work needed.
Keep the commissioning report or other original performance data for the life of the equipment where possible. Store it with the user manual, later test reports and the log of routine checks, maintenance, replacements and repairs. This gives the next examiner a benchmark and shows what happened between statutory tests. It also makes a falling airflow or pressure reading easier to spot.
Booking LEV testing services
Book testing services from a competent person. Check that the tester works to published standards where these apply to the equipment. HSE describes checks against equipment-specific requirements as well as the original design information. Ask about relevant training and experience before booking. Agree any extra services and costs before the visit, such as a commissioning report if the original records are missing.
Plan safe access with the examiner. HSG258 identifies health risks from residues inside the system and safety risks from moving parts, electricity and work at height. Tell the examiner about these hazards and any protective equipment needed.
Checks between statutory tests
Employers must keep the extraction working between statutory tests. HSG258, Controlling airborne contaminants at work, explains in paragraph 106 how to check hoods while the work process is running. Options include an anemometer, dust lamp or smoke tracer. An airflow indicator is often the simplest way for an operator to see whether airflow at the hood is adequate.
HSG258 gives daily, weekly and monthly checks as examples for the system logbook. Typical checks cover damage or blockages in hoods, duct condition, airflow indicators, filters, unusual fan noise or vibration and whether operators are using the hood correctly.
A weekly visual check is not a substitute for the statutory test. Staff can look for damage, confirm indicators respond and record maintenance, but a competent examiner carries out the detailed visual and structural examination, performance measurements and assessment of control. Follow the manufacturer and risk assessment when setting check frequencies. Repair defects when found rather than waiting for the next test visit.
If the test is late
Book a competent examiner as soon as you discover the date has passed. Review the last report, the current condition of the system and the hazardous substance risk. An expired date does not show that the LEV has failed, but it does mean you no longer have the current examination required to confirm its performance.
Do not continue the process without effective exposure controls while waiting. If the LEV cannot be shown to provide adequate control, stop that work or use another control justified by the risk assessment until the system has been examined, any defects repaired and its control confirmed. Record the decision, the booking, any temporary controls and the work completed.
Questions duty holders ask
How often does a lev need to be checked?
Distinguish routine checks from the thorough examination and test. HSG258 describes daily, weekly and monthly checks in the logbook. The statutory examination has a general maximum interval of 14 months, with shorter intervals for the Schedule 4 processes.
How often should lev be tested?
At least once every 14 months for most installations. Use the shorter interval where Schedule 4 applies. HSG258 recommends more frequent testing where wear could reduce effectiveness between visits.
How often is Lev checked?
Routine checks follow the user manual and the checks set out in the logbook. These continue between statutory examinations. A routine visual check does not replace the detailed assessment by a competent examiner.
How often does your lev need to be checked?
Check the process and its testing interval, then the maintenance and user-check schedule for your equipment. HSG258 says shorter examination intervals are needed if wear is liable to reduce effectiveness between tests.
Why is Lev testing every 14 months?
That is the general maximum interval specified in COSHH Regulation 9(2)(a). It is a legal deadline, not a guarantee that equipment remains effective until then. Schedule 4 specifies shorter intervals for certain processes, and maintenance continues between examinations.
Is the LEV test due every year?
The general legal maximum is 14 months. Schedule 4 sets shorter intervals for certain processes. Check which interval applies before booking.
Can an LEV system need testing more often than every 14 months?
Yes. COSHH sets shorter intervals for certain processes, and HSG258 says testing should be more frequent where wear could reduce effectiveness between visits.
How long must I keep an LEV test report?
Keep the examination and test record, or a suitable summary, available for at least five years from the date it was made.
Does a weekly check replace the thorough examination and test?
No. Routine checks help find damage or performance changes. The statutory examination is a separate, detailed assessment by a competent person.
Is your next test due?
Put in the date of the last test and get the deadline, with a reminder if you want one.
LEV test due date calculatorUse the directory to find an LEV tester near you.
Sources
- Legislation.gov.uk: COSHH Schedule 4, opened 23 September 2026
- Legislation.gov.uk: COSHH Regulation 9, maintenance, examination and testing of control measures, opened 23 September 2026
- HSE: LEV frequently asked questions, opened 23 September 2026
- HSE: Controlling airborne contaminants at work, HSG258, opened 23 September 2026
- HSE: HSG258 full guidance, opened 23 September 2026